Protection&Control Transmission Line Protection Busbar Protection Transformer Protection Circuit Breaker Protection Generator Protection Feeder Protection Capacitor Protection Motor Protection Transfer & Synchronization Arc Protection
Digital Substation PCS-221S Merging Unit PCS-221 Merging Unit PCS-222 Circuit Breaker Controller PCS-9250 AC Electronic CT/VT
Automation PCS-9700 Automation System PCS-9700 HMI Software PCS-9705 Bay Control Unit PCS-9705S Bay Control Unit PCS-9799 Station Manager PCS-9799S Station Manager PCS-9710 Remote Terminal Unit PCS-9710S Remote Terminal Unit PCS-9794 Protocol Converter PCS-9785 Satellite-Synchronized Clock PCS-9882 Ethernet Switch PCS-9882Rx DIN Rail Managed Ethernet Switch PCS-9882XD Managed Ethernet Switch PCS-9884 Managed Ethernet Switch Supporting HSR and PRP MUX-2M/64 Communication Interface
Phasor Measurement PCS-997S Fault Line Locator PCS-996S-G Phasor Data Concentrator PCS-996 Phasor Measurement Unit
Disturbance Fault Recording PCS-996RC Disturbance Fault Recorder PCS-996R Disturbance Fault Recorder PCS-986 Disturbance Fault Recorder PCS-9013 DFR Management System
Stability Control System PCS-992 Power Stability Control System PCS-993 Out-of-Step Controller PCS-994 Frequency & Voltage Controller PCS-994S Frequency and Voltage Controller
Power Grid Monitoring and Control PCS-9000 Energy Management System PCS-9000 Distribution Management System
Configuration Tool PCS-Torch MOT Tool PCS-Studio Configuration Tool PCS-Explorer IED Configuration & Debugging Tool PCS-SCD Configuration Tool PCS-COMM Configuration & Debugging Tool
Accessories MD1501 Series Auxiliary Relays MD1701 Series Test Blocks MD1701S Test Block
FACTS PCS-9580 Static Var Compensator PCS-9583 Static Synchronous Compensator PCS-9570 Series Compensation PCS-9590 DC De-Icer PCS-9578 Controllable Shunt Reactor PCS-8200 Unified Power Flow Controller PCS-9571 Fault Current Limiter PCS-9564A Dynamic Voltage Restorer PCS-9569 Shore Power System
HVDC PCS-8600 UHVDC Converter Valve System PCS-9550 LCC-HVDC Control and Protection System PCS-8100 VSC-HVDC IGBT Valve PCS-9520 VSC-HVDC Control and Protection System PCS-9510 Cooling System PCS-8300 High-voltage DC Circuit Breaker PCS-9250 DC Electronic CT/VT
PV & Wind Power Grid-Connection PCS-9700 Renewable Energy SCADA PCS-9726 Generation Management Unit PCS-9700F Power Forecast System PCS-9700R AGC/AVC
Battery Energy Storage System PCS-9567MV-10000 Medium Voltage Skid PCS-9567MV-7000 Medium Voltage Skid PCS-9567MV-5000 Medium Voltage Skid PCS-9567MV-3500 Medium Voltage Skid PCS-9567-2500 Twin Power Conversion Systems PCS-9567-2500 電力変換システム PCS-9567-1750 Power Conversion System PCS-9567-1750 電力変換システム PCS-9567 Power Conversion System Vulnerability Disclosure Policy パワーコンディショナー脆弱性開示ポリシー
Microgrid PCS-9617MG Microgrid Controller
Static Frequency Converter PCS-9575 Static Frequency Converter
Protection,Automation&Control DMS EMS Stability Control & WAMS Digital Substation
HVDC & FACTS De-Icing Unified Power Flow Controller (UPFC) Series Compensation Static Synchronous Compensator(STATCOM) Static Var Compensator (SVC) LCC-HVDC Transmission VSC-HVDC Transmission
Renewable & Microgrid Energy Storage System Microgrid PV Generation SFC
Power Generation Pumped Storage Power Plant Nuclear Power Plant Hydro Power Plant Thermal Power Plant
Transmission System AC Transmission LCC-HVDC Transmission VSC-HVDC Transmission
Distribution System Distribution Network
Industrial Consumer Urban Track Traffic Electrified Railway Oil & Petrochemical Metals & Mining
Towering at an unparalleled elevation above sea level and holding endless snow-capped mountains and glaciers, the Qinghai-Tibet Plateau is crowned as the “Roof of the World”. Its unique topography creates enchanting natural landscapes, yet poses significant challenges to the local people’s daily life and social production.
As we are approaching the New Year, the world’s highest-altitude photovoltaic (PV) and energy storage project, the 50MW “PV + Energy Storage” power generation project by the Tibet Branch of China Huadian Corporation in Caipeng, Shannan City, was successfully connected to the grid and officially put into operation. With an annual average electricity generation of 90 million kilowatt-hours, the project can save 28,000 tons of standard coal and reduce carbon dioxide emissions by 92,000 tons annually.
The Caipeng “PV + Energy Storage” power station is located on the plateau at an altitude of 5,100 meters. The construction involves a 50MW PV power generation project along with a 10MW/40MWh energy storage system. The project will significantly alleviate regional and seasonal power shortage, effectively improve the safety and stability of the Tibet power grid, enhance the local residents’ living standards, and promote regional development.

NR provided a complete set of energy storage AC-side equipment for the Caipeng “PV + Energy Storage” power station. The energy storage system in Caipeng can not only shift energy over time for PV power generation, extending the supply time of the PV system, but also coordinate control through an energy management system and PV system. This helps smooth out the fluctuations and intermittency of PV power, enabling peak shaving, frequency regulation, voltage regulation, power prediction correction, planned curve fitting, etc. This enhances the grid-friendliness and benefits from PV power generation.
The Caipeng “PV + Energy Storage” power station is the world’s first successful application of energy storage equipment at an elevation of more than 5,000 meters above sea level. Since the air density decreases with the increase in altitude, the dielectric strength of equipment decreases by 8% to 13% for every 1,000 meters rise in altitude. The dramatic fluctuations in temperature between day and night, coupled with extreme weather conditions, imposes extremely high requirements on the operating environment temperature of energy storage equipment.

The success of the project is attributed to NR’s extensive experience in the construction of the Tibet power grid over the years. From the Qinghai-Tibet Interconnection Project in 2011 to the Sichuan-Tibet Interconnection, Central Tibet Interconnection, NR has provided a large number of power equipment, including HVDC transmission equipment, large-capacity FACTs equipment, power grid stability control equipment, protection control equipment, etc. for the Tibet power grid. NR is well-versed in the characteristics and requirements of electrical equipment in high-altitude areas and has developed a comprehensive high-altitude solution for such scenarios. Given the ultra-high altitude of this project, precise calculations were made in the stages of project design and equipment selection. Key components underwent environmental simulation testing, followed by adjustments in component selection and parameter adaptation, ensuring the safe operation of equipment and the personal safety of maintenance personnel.
Since the project is situated at a remote location with harsh natural environment and rugged roads, NR’s team conducted thorough site surveys based on project requirements, formulated professional and reliable equipment transportation plans, organized efficient on-site service personnel, optimized on-site commissioning processes, strictly adhered to project progress milestones, and successfully completed the task with high quality.
The successful commissioning of the Caipeng “PV + Energy Storage” power generation project reflects NR’s corporate mission of “creating value and serving the society”. NR will continue to improve Tibet’s power supply and grid power capacity, ensuring a balanced and orderly power supply.